Construction Journal

Keyword: Rotes Rathaus

Rotes Rathaus underground station: the entrances are free © A. Reetz-Graudenz
Nov. 6, 2020

Rotes Rathaus underground station: the entrances are free

At the Rotes Rathaus underground station, the enclosures of the entrances were dismantled.

 

"A new tunnel through Berlin" - The photo book on the construction of the new U5 © BVG Projekt GmbH
Oct. 6, 2020

"A new tunnel through Berlin" - The photo book on the construction of the new U5

The new illustrated book "A new tunnel through Berlin" is now available. Today it was presented in the underground station Rotes Rathaus.

 

150 years red city hall - our construction fence celebrates! © I. Levintov
Sept. 16, 2020

150 years red city hall - our construction fence celebrates!

New building fence design on the occasion of the celebration of the 150th anniversary of the Rotes Rathaus.

 

So chic: The underground station Rotes Rathaus © A. Reetz-Graudenz
May 5, 2020

So chic: The underground station Rotes Rathaus

At the underground station Rotes Rathaus the benches are installed and the terrazzo floor is covered. All in chic black and white.

 

The U5 Construction During Corona Times © A. Reetz-Graudenz
April 21, 2020

The U5 Construction During Corona Times

So far we are lucky! We are spared from cases of illness. Even in corona times, the extension of the new U5 is progressing: the underground stations Unter den Linden and Rotes Rathaus are getting the finishing touches. "Museumsinsel" gets ...

 

A tunnel on a diet: Work on the Alex tunnel is progressing. © A. Reetz-Graudenz
March 25, 2020

A tunnel on a diet: Work on the Alex tunnel is progressing.

The construction site above the Alex tunnel is in progress: Asphalt and concrete layers are being removed, pipes are being secured and relocated.

 

The first subway between Alexanderplatz and Brandenburg Gate © A. Reetz-Graudenz
March 10, 2020

The first subway between Alexanderplatz and Brandenburg Gate

Today the first subway went through the three new subway stations. Its destination: the U55 between Brandenburg Gate and the main station.

 

The Alex-Tunnel loses weight © A. Reetz-Graudenz
Dec. 2, 2019

The Alex-Tunnel loses weight

The lightening above the Alex tunnel reduces its load.

 

Danger! Hot! The rail welding © A. Reetz-Graudenz
April 9, 2019

Danger! Hot! The rail welding

The tunnel between the Rotes Rathaus underground station and the Museumsinsel underground station is hot: rail welding is in progress!

 

Farewell to the construction workers of the shell at underground station Rotes Rathaus © Reetz-Graudenz
Jan. 5, 2017

Farewell to the construction workers of the shell at underground station Rotes Rathaus

The shell of underground station Rotes Rathaus has been completed. The shell of underground station Rotes Rathaus is followed by building it up.

 

Tags

Alex Tunnel Alex tunnel Alex-Tunnel Alexanderplatz BVG BVG Projekt GmbH Ballast Bank wall Braille Conduit Corona Demolition Diaphragm wall Dismantling Diver Electricity Fangedamm Foam glass gravel Friedrichstraße Gas Info-Flyer InfoTour Lighting Marx-Engels-Forum Museum Island Museumsinsel Pipes Rabitzdecke Rathausstraße Red City Hall Rotes Rathaus Schinkel blue Spreekanal Surface Tunnel U5 UdL Unter den Linden Wire saw accessibility back track wall ballast bench breakthrough building site calotte christmas cofferdam concreting conductor rail construction fence construction site cooperation december deconstruction delivery dismantling electrical elevator emergency telephone enclosures entrance area entrances escalator escalators exits extension finishing finishing works fire protection floor plates foam glass gravel gap closure granite guide system icing illustrated book info wagon infopoint infowaggon inner shell lamps lettering lifts lightening lights march mining tunnelling museum island museumsinsel new exhibition newsletter open house operations pipeline construction platform rabitz ceiling rail road track construction rail welding rear track wall rear track walls rotes rathaus schinkel sea of lights seating senate chancellery shell side galleries smoke extraction flaps special underground engineering stairs starry sky starting shaft structural work substructure subway surface surface restoration terrazzo test test run thawing topping-out ceremony tour track change track changing system track construction track switch area tracks tubbings tunnel tunnel walls u5 underconstruction underground underground station underground station Rotes Rathaus underground station museumsinsel underground station under den linden unter den linden vacuum cleaner video virtual reality wall plates work train

Archive zum Bautagebuch

This website uses cookies to enable certain functions and an user-oriented and smooth navigation. If you continue, you agree with the usage of cookies.