The starry sky is shining! © A. Reetz-Graudenz
Oct. 19, 2020

The starry sky is shining!

Great progress is being made in the platform area of the Museumsinsel underground station: the starry sky is shining!

 

... and night falls. © A. Reetz-Graudenz
Sept. 10, 2020

... and night falls.

The starry sky in the underground station Museumsinsel gets its blue paint.

 

The U5 Construction During Corona Times © A. Reetz-Graudenz
April 21, 2020

The U5 Construction During Corona Times

So far we are lucky! We are spared from cases of illness. Even in corona times, the extension of the new U5 is progressing: the underground stations Unter den Linden and Rotes Rathaus are getting the finishing touches. "Museumsinsel" gets ...

 

Tags

Alex Tunnel Alex tunnel Alex-Tunnel Alexanderplatz BVG BVG Projekt GmbH Ballast Bank wall Braille Conduit Corona Demolition Diaphragm wall Dismantling Diver Electricity Fangedamm Foam glass gravel Friedrichstraße Gas Info-Flyer InfoTour Lighting Marx-Engels-Forum Museum Island Museumsinsel Pipes Rabitzdecke Rathausstraße Red City Hall Rotes Rathaus Schinkel blue Spreekanal Surface Tunnel U5 UdL Unter den Linden Wire saw accessibility back track wall ballast bench breakthrough building site calotte christmas cofferdam concreting conductor rail construction fence construction site cooperation december deconstruction delivery dismantling electrical elevator emergency telephone enclosures entrance area entrances escalator escalators exits extension finishing finishing works fire protection floor plates foam glass gravel gap closure granite guide system icing illustrated book info wagon infopoint infowaggon inner shell lamps lettering lifts lightening lights march mining tunnelling museum island museumsinsel new exhibition newsletter open house operations pipeline construction platform rabitz ceiling rail road track construction rail welding rear track wall rear track walls rotes rathaus schinkel sea of lights seating senate chancellery shell side galleries smoke extraction flaps special underground engineering stairs starry sky starting shaft structural work substructure subway surface surface restoration terrazzo test test run thawing topping-out ceremony tour track change track changing system track construction track switch area tracks tubbings tunnel tunnel walls u5 underconstruction underground underground station underground station Rotes Rathaus underground station museumsinsel underground station under den linden unter den linden vacuum cleaner video virtual reality wall plates work train

Archive zum Bautagebuch

This website uses cookies to enable certain functions and an user-oriented and smooth navigation. If you continue, you agree with the usage of cookies.