Alex tunnel: 100 percent lightened! © A. Reetz-Graudenz
Oct. 29, 2020

Alex tunnel: 100 percent lightened!

The ground above the Alex tunnel is 100% lightened, so it's ready for the passage of the new U5!

 

Relocation stress at the Marx-Engels Forum © A. Reetz-Graudenz
Oct. 8, 2020

Relocation stress at the Marx-Engels Forum

Progress at the Marx-Engels Forum: Implenia's container castle has been dismantled and the tunnel opening has been closed.

 

Thick things over the Alex-Tunnel © A. Reetz-Graudenz
Sept. 14, 2020

Thick things over the Alex-Tunnel

In the ground above the Alex tunnel there are 30 percent more lines than the plans indicate. An example of what this means in practical terms for the construction process.

 

Unter den Linden: Clear view © A. Reetz-Graudenz
May 20, 2020

Unter den Linden: Clear view

On the boulevard "Unter den Linden" the container castles and the solid construction fences were dismantled. The subway station is almost finished. On the surface the restoration begins.

 

Tags

Alex Tunnel Alex tunnel Alex-Tunnel Alexanderplatz BVG BVG Projekt GmbH Ballast Bank wall Braille Conduit Corona Demolition Diaphragm wall Dismantling Diver Electricity Fangedamm Foam glass gravel Friedrichstraße Gas Info-Flyer InfoTour Lighting Marx-Engels-Forum Museum Island Museumsinsel Pipes Rabitzdecke Rathausstraße Red City Hall Rotes Rathaus Schinkel blue Spreekanal Surface Tunnel U5 UdL Unter den Linden Wire saw accessibility back track wall ballast bench breakthrough building site calotte christmas cofferdam concreting conductor rail construction fence construction site cooperation december deconstruction delivery dismantling electrical elevator emergency telephone enclosures entrance area entrances escalator escalators exits extension finishing finishing works fire protection floor plates foam glass gravel gap closure granite guide system icing illustrated book info wagon infopoint infowaggon inner shell lamps lettering lifts lightening lights march mining tunnelling museum island museumsinsel new exhibition newsletter open house operations pipeline construction platform rabitz ceiling rail road track construction rail welding rear track wall rear track walls rotes rathaus schinkel sea of lights seating senate chancellery shell side galleries smoke extraction flaps special underground engineering stairs starry sky starting shaft structural work substructure subway surface surface restoration terrazzo test test run thawing topping-out ceremony tour track change track changing system track construction track switch area tracks tubbings tunnel tunnel walls u5 underconstruction underground underground station underground station Rotes Rathaus underground station museumsinsel underground station under den linden unter den linden vacuum cleaner video virtual reality wall plates work train

Archive zum Bautagebuch

This website uses cookies to enable certain functions and an user-oriented and smooth navigation. If you continue, you agree with the usage of cookies.